3'-100lbs. L-Bracket
For Library Foundation - CO Irving,TX

3D modeled, tested/simulated, and furnished shop drawings to fabricate (3’x1’- 100 lbs.) L-Bracket with stiffeners for 100 SF 8’’ library foundation support as per the civil/structural specifications. Procured Materials schedule and Project Managed throughout Installation and Service.

April-July, 2021

Project Management
Demolition - Tesla Giga Texas, Austin, TX

Worked as a Prime Contractor and coordinated with Subcontractors and Tesla's Construction Management team to successfully complete half a million $ concrete demolition project. Coordinated to mitigate issues like heavy equipment shortage, equipment access, security access, and scheduling. Maintained OSHA standards while performing the job.

Nov, 2021

Privacy Screen Development
DOT Thomas, CH, TX

3D Modeled a new design of privacy screen for the park concession stand, procured the BOM, coordinated with vendors for procurement of the materials, oversaw the fabrication and installation. The new design was focused on three main characteristics: Constructability, serviceability, and Aesthetics.